Slate Implementation Testing Help

Integration Flow Tests

Introduction

Integration Flow Tests are conducted to validate the seamless data flow between Slate and Banner. These tests ensure that data is accurately transferred, processed, and reflected across both systems without disruption to workflows.

Objectives

  1. Verify that all stages of the integration workflow execute as intended.

  2. Ensure data integrity during transfers between Slate and Banner.

  3. Validate error handling at each stage of the integration.

  4. Confirm the synchronization of data updates in real time or scheduled intervals.

Test Cases

1. Application Submission Workflow

Test ID

IF-001

Description

Validate that a submitted application in Slate is successfully transferred to Banner.

Input

Complete application form in Slate.

Expected Output

Application data appears in Banner with all fields correctly populated.

Steps

1. Submit application in Slate.


2. Trigger integration process.


3. Confirm application data in Banner.

Status

Pending

Owner

Integration QA Team

2. Checklist Updates Synchronization

Test ID

IF-002

Description

Ensure checklist updates in Slate reflect in Banner.

Input

Checklist item marked as "Received" in Slate.

Expected Output

Corresponding checklist status in Banner updates to "Received."

Steps

1. Update checklist item in Slate.


2. Trigger sync.


3. Confirm checklist status in Banner.

Status

Pending

Owner

Admissions Team

3. Data Roundtrip Validation

Test ID

IF-003

Description

Confirm that data entered in Slate and updated in Banner is reflected back in Slate.

Input

Update citizenship status in Banner.

Expected Output

Citizenship status change reflects in Slate.

Steps

1. Update data in Banner.


2. Trigger sync back to Slate.


3. Confirm data in Slate matches Banner.

Status

Pending

Owner

Integration QA Team

4. Error Logging and Notifications

Test ID

IF-004

Description

Validate that errors during integration are logged and trigger notifications.

Input

Introduce invalid data in Slate.

Expected Output

Error log generated, and notification sent to admin.

Steps

1. Input invalid data.


2. Run integration.


3. Verify error log and notification.

Status

Pending

Owner

IT QA Team

5. Real-Time Sync Validation

Test ID

IF-005

Description

Ensure that real-time synchronization updates fields in both systems immediately.

Input

Modify application status in Slate.

Expected Output

Application status in Banner updates in real time.

Steps

1. Update field in Slate.


2. Confirm update in Banner in real time.

Status

Pending

Owner

Integration QA Team

Metrics for Success

Metric

Target

Successful Data Transfers

100%

Error-Free Integration Flows

99.9%

Real-Time Sync Response Time

< 5 seconds

Data Roundtrip Accuracy

100%

Recommendations

  1. Improve Error Reporting:

    • Enhance error logs to provide detailed information on failures.

  2. Test All Edge Cases:

    • Include scenarios with missing, invalid, and conflicting data.

  3. Optimize Real-Time Sync:

    • Ensure minimal latency for critical updates.

  4. Conduct Periodic Reviews:

    • Regularly review integration flows to identify potential bottlenecks or issues.

Last modified: 13 January 2025